US$ 68.00
Digital PID temperature and rotation speed control
25" Diameter LID
removable shelves that pull out and stay in place for easy load/unload
84 inches 16
BVV Recovery Pump Top Dead Center Piston Calibration Plate Consumable Digital PID temperature and rotationBVV Butane Recovery Pumps Top Dead Center Calibration Plate & Bolts Use with the Top Dead Center Clearance (TDCC) instructions Use this plate and a depth gauge to measure the Top Dead Center Clearance of the piston cylinder head assembly. Shims that come with the piston cylinders are stacked to create an area of displacement between the top of the cylinder and the compressor head. BVV's Recommended depth is 0. 012" for the BVV 4 & 2 Cylinder Butane
US$ 68.00
US$ 68.95
US$ 189.00
US$ 134.48